| D1.2 | Data Management Plan | M6 |
| D1.3 | Updated Data Management Plan | M30 |
| D1.5 | Final project report | M36 |
| D1.6 | Project Quality and Risk Management Plan | M3 |
| D2.1 | Scenario analysis report for rural applications with African solar profiles | M18 |
| D2.2 | Report on electrolyser dynamic behaviour limitations | M24 |
| D2.3 | Data set on PV electricity production | M27 |
| D2.4 | Report on electrolyser optimization | M30 |
| D2.5 | Dynamic system model integrating PV–PEM–LOHC | M30 |
| D2.6 | Report on demonstration of green H2 production from solar | M36 |
| D3.1 | Report H2 storage and release catalyst screening isothermal conditions | M18 |
| D3.2 | Report on the kinetics for adiabatic H2 storage and H2 release using a structured reactor | M30 |
| D3.3 | Report LOHC cyclability, catalyst stability, and H2 purity | M36 |
| D4.1 | Optimisation of HICE performance for LOHC compatibility | M18 |
| D4.2 | Design for LOHC-Compatible HICE | M30 |
| D4.3 | HICE emissions report | M30 |
| D5.1 | Preliminary Replication potential assessment and overall cost assessment | M18 |
| D5.2 | Report on site selection in East Africa and SWIO | M30 |
| D5.3 | Techno-economic assessment and Replication Roadmap | M36 |
| D5.4 | Environmental assessment | M36 |
| D5.5 | Green hydrogen social acceptance report | M36 |
| D6.1 | Dissemination and Communication Strategy | M3 |
| D6.2 | Dissemination and Communication Report | M36 |